mirror of
https://github.com/swaywm/sway.git
synced 2024-11-21 23:41:27 +00:00
Document release cycle in CONTRIBUTING.md
This commit is contained in:
parent
af44154119
commit
d515ab0004
|
@ -5,6 +5,28 @@ successful with your contribution if you visit the [IRC
|
|||
channel](http://webchat.freenode.net/?channels=sway&uio=d4) upfront and discuss
|
||||
your plans.
|
||||
|
||||
## Release Cycle
|
||||
|
||||
There are three stages of a sway release. Say the current stable version is
|
||||
0.7. The master branch of sway is working towards becoming the 0.8 release. 0.8
|
||||
will go through each of these three stages:
|
||||
|
||||
**In development**: during this time 0.8 lives in the master branch and is
|
||||
considered unstable. All pull requests merged during this time will land in sway
|
||||
0.8.
|
||||
|
||||
**Release candidate**: at some point (usually when development is fairly quiet),
|
||||
@SirCmpwn will announce an upcoming release candidate (often 2 weeks in
|
||||
advance). When the two weeks are up, a branch is cut (i.e. 0.8-rc1) and from
|
||||
that point only bugfix pull requests land in this branch. Each morning, if
|
||||
bugfixes landed in 0.8 during the previous day, a new RC is cut. During the RC
|
||||
phase, more adventurous users are encouraged to upgrade and start looking for
|
||||
and reporting bugs (especially in new features).
|
||||
|
||||
**Stable release**: when no substantial changes are merged into an RC for 1
|
||||
week, it's released as a new stable version of Sway. At this point, all users
|
||||
are encouraged to upgrade.
|
||||
|
||||
## Pull Requests
|
||||
|
||||
If you already have your own pull request habits, feel free to use them. If you
|
||||
|
|
Loading…
Reference in a new issue